Happy Halloween – not liking the old man winter costume

There is always a scurry of exterior work with the first forecast of snow.  Outside crews have been busy working on the concrete slabs, curbs & gutter.  On the Care Center side they have been working on the future secure courtyard.  Inside the crews have started the finishing touches on the curved hallway connecting the clinic to the hospital by putting up the vapor barrier and sheetrock.

Curb & gutter at front canopy

Curb & gutter at front canopy

Front canopy gets curb & gutter

Front canopy gets curb & gutter

Concrete work under front entrance canopy

Concrete work under front entrance canopy

Front canopy area getting formed up fro some concrete

Front canopy area getting formed up fro some concrete

Exterior front entrance area

Exterior front entrance area

Front hallway gets vapor barrier

Front hallway gets vapor barrier

Front hallway between clinic and hospital

Front hallway between clinic and hospital

Future Radiology area

Future Radiology area

New Lab space getting painted out

New Lab space getting painted out

Care Center courtyard progress

Care Center courtyard progress

Lab nalyzer

Lab analyzer

 

Beating the snow – more outside progress

The crew is trying to race the snow by getting as much done outside as possible before winter hits.

103

Windows in the new corridor have been installed.

Windows in the new corridor have been installed.

036

The new parking area and driveway have been leveled off - ready for more curbing, sidewalk and asphalt.

The new parking area and driveway have been leveled off – ready for more curbing, sidewalk and asphalt.

Most of the studs are up for the second household kitchen and common commercial kitchen.

Most of the studs are up for the second household kitchen and common commercial kitchen.

Care Center 300 wing received insulation - ready for siding.

Care Center 300 wing received insulation – ready for siding.

Front entrance is taking shape

Along with progress on the front entrance, many new areas have studs that are beginning to outline what Radiology, Resident rooms and a new lab will look like.

027

The front entrance is starting to form with the eventual drive-thru canopy.

The front entrance is starting to form with the eventual drive-thru canopy.

New studs outline all of the Resident rooms.

New studs outline all of the Resident rooms.

The Care Center 300 wing is getting windows installed.

The Care Center 300 wing is getting windows installed.

Most of the new Lab area is framed.

Most of the new Lab area is framed.

The new hallway is taking shape.

The new hallway is taking shape.