Beating the snow – more outside progress

The crew is trying to race the snow by getting as much done outside as possible before winter hits.

103

Windows in the new corridor have been installed.

Windows in the new corridor have been installed.

036

The new parking area and driveway have been leveled off - ready for more curbing, sidewalk and asphalt.

The new parking area and driveway have been leveled off – ready for more curbing, sidewalk and asphalt.

Most of the studs are up for the second household kitchen and common commercial kitchen.

Most of the studs are up for the second household kitchen and common commercial kitchen.

Care Center 300 wing received insulation - ready for siding.

Care Center 300 wing received insulation – ready for siding.

Any thoughts?