Ceilings installed and walls prepped

Studs are being placed in preparation for wall installation. The old maintenance room and kitchen is nearly empty so the crew can start transforming it into the new ER and patient rooms.

The crew is starting to stand up studs for wall installation.

The crew is starting to stand up studs for wall installation.

016 033

Ceiling tiles have been installed.

Ceiling tiles have been installed.

The OR and the scope cleaning room are taking shape.

The OR and the scope cleaning room are taking shape.

The maintenance shop is almost cleared out to become the new ER with three patient rooms.

The maintenance shop is almost cleared out to become the new ER with three patient rooms.