Front Entryway steel gets some paint

The front entrance has been getting a lot of attention.  Swanson & Youngdale has been painting the structural steel in the main entry and areas outside.  The crews have put up a temporary plastic tent around the exterior of the main entry to allow painting.  Inside, they are putting up sheetrock in the future maintenance, purchasing and meeting space areas.  Demolition continues in the old PT area.

Front entryway steel gets painted

Front entryway steel gets painted

Structural steel gets painted in the main entryway

Structural steel gets painted in the main entryway

Exterior of main entrance gets painted

Exterior of main entrance gets painted

Temporary plastic tent covering the main entrance

Temporary plastic tent covering the main entrance

Temporary tenting on main entry to allow exterior to be painted

Temporary tenting on main entry to allow exterior to be painted

Inside main entry with temporary tent

Inside main entry with temporary tent

Sheetrock gong up in future maintenance and purchasing.

Sheetrock gong up in future maintenance and purchasing.

PT demo

PT demo

neat demo picture

neat demo picture

The kitchen between Care Center households.

The kitchen between Care Center households.

Any thoughts?