Happy Fourth of July week!

We hope everyone had a great holiday week! The staff is excited to have been moved into the new Care Center 200 wing this week. Ceilings in many areas of the hospital now have grid, and many of the walls have been painted. Now, floors are getting prepped for floor installation.

The CT room has been painted and ceiling grid has been installed.

The CT room has been painted and ceiling grid has been installed.

011

The Pharmacy and the ER have been painted, and cabinetry has been installed. The floors are getting prepped for florring.

The Pharmacy and the ER have been painted, and cabinetry has been installed. The floors are getting prepped for florring.

There's now a foundation wall at the front entrance.

There’s now a foundation wall at the front entrance.

Any thoughts?