Outside progress before winter arrives

The crews are working hard on the outside of the building before the weather turns cold. On the inside, areas are being cleared out and getting prepared to become new wings of the hospital.

106 071 056

Grass, hydro seed, erosion control, and base blacktop have started to take shape.

Grass, hydro seed, erosion control, and base blacktop have started to take shape.

This wide open space will be Care Center 300.

This wide open space will be Care Center 300.

This space is getting ready to be transformed into the radiology area.

This space is getting ready to be transformed into the radiology area.

Foundations are ready for part of the new entrance.

Foundations are ready for part of the new entrance.

Any thoughts?