Preparing for Inspection Week

Big week coming up, preparing for our inspection by the Minnesota Department of Heath.  Crews are busy finishing up the Radiology and Lab area, installing carpet in the main hallway between the hospital and clinic and installing kitchen equipment in the 300 Wing of the Care Center.  Exciting to see the GE equipment now installed in the Radiology area.

GE equipment in Radiology Dept.

GE equipment in Radiology Dept.

Cabinet installation

Cabinet installation

Lab area with new countertops

Lab area with new countertops

Curved hallway between clinic and hospital now has carpet installed

Curved hallway between clinic and hospital now has carpet installed

Fireplace getting roughed in

Fireplace getting roughed in

Temporary plastic wall enclosing the temporary Registration Desk

Temporary plastic wall enclosing the temporary Registration Desk

Boldt crew installing doors at the Radiology area

Boldt crew installing doors at the Radiology area

Kitchen equipment in Care Center

Kitchen equipment in Care Center

300 Wing of the Care Center has carpet, nurse call station, smoke detectors, lights and ceiling tiles.

300 Wing of the Care Center has carpet, nurse call station, smoke detectors, lights and ceiling tiles.

Exterior canopy is getting the edge trim installed

Exterior canopy is getting the edge trim installed

Any thoughts?