Weathering the weather

Despite the chilly weather conditions, the team is continuing to prepare outside areas for progress. The footings for the ER garage and the employee entrance are completed and the foundation walls have been formed. Inside, many areas now have flooring and paint, including eight resident rooms, kitchen and dining room.

The dining area and the kitchen are now painted.

The dining area and the kitchen are now painted.

The flooring has been installed for all eight resident rooms.

The flooring has been installed for all eight resident rooms.

The kitchen cabinets have arrived!

The kitchen cabinets have arrived!

041

The doors to the new OR/procedure room have been installed, and the OR has been painted.

The doors to the new OR/procedure room have been installed, and the OR has been painted.